    Curt Gowdy State Park-State of WY Parks Department Erosion Mitigation

    The 2 reservoirs within the state park were suffering from moderate to severe erosion damage throughout the entire area. The 2 year scope of work included cut fill balancing of over 80,000 cubic yards of on-site material and the import of 8,000 tons of crushed base. Reclamation operations included the elimination of steep slope areas with various types of erosion control measures.

    -Cut/Fill 70,000 cubic yards of on-site material.
    -Import and placement of 8,000 tons of Crushed Base.
    -Construction and maintenance of 25 miles of primary and secondary roads.
    -1200 lineal feet of storm water pipe.
    -A new 3 acre day use parking area.
    -Reconstruction/Remediation of 120 existing campsites.
    -35 new variable use campsites.
    -5 new ADA campsites.
    -10,000 lineal feet of various types of fencing.
    -7 acres of seeding and bonded fiber matrix.
    -Placement of various types of permanent erosion control measures.